Commercial building shell under construction

Commercial

Clear-span shells
your own crew can erect.

Bolt-together aluminum as the alternative to pre-engineered metal buildings. Kits in 6 to 10 weeks instead of 14 to 26, erected by a general framing crew, non-combustible, and expandable a bay at a time.

Non-combustibleASTM E136 tested
PE-stamped engineeringPermit-ready packages
US patent grantedBolted Master Lock joint
6061-T6 aluminumNo rot, no termites, 100% recyclable

Why operators switch

Three lines on the pro forma.

Lead time, erection labor, and the cost of the second phase are where a PEMB quote loses to this one.

01 / Lead time

Kits in 6 to 10 weeks, not 14 to 26.

PEMB frame kits sit in a steel mill queue before erection even starts. Aluminum profiles are extruded to your drawings and ship when the engineering is stamped.

02 / Labor

Your own crew erects the shell.

No specialty steel erector to mobilize. A general framing crew with a telehandler bolts the structure together for roughly $3 to $5 per sq ft, against $7 to $15 for a red-iron erector.

03 / Phase 2

The next bay bolts on.

Unbolt the end wall, bolt on the bay, close it back up. Expand a facility without re-mobilizing welders or re-permitting a structural addition.

Where the frame goes to work

One system.
Every market we have priced.

The same profiles and the same patented lock, from a 400 sq ft studio to a 35,000 sq ft clear-span hall. Pick your market and read the numbers.

Solutions

Built for how you build.

Your ADU, Built in Weeks

Where a traditional build takes 8 to 12 months, a Core X Frame structure can go from bare ground to move-in ready in a fraction of the time. Less disruption to your life, faster return on investment.

Built to Last a Lifetime

Aluminum doesn't rot, warp, crack, or attract termites. Your frame is essentially permanent. No re-framing, no structural surprises decades down the road.

Design Freedom

Floor-to-ceiling glass walls, dramatic rooflines, open-plan interiors. The aluminum frame's strength means fewer compromises.

Glass and wood ADU pod with deck in landscaped yard